New Zealand is in our lowest freight zone. A MAKO home suits a sleepout, a second dwelling on the family block, a bach or worker accommodation.
Your house price is fixed. Ocean freight is its own line, priced by destination, and locked in when you pay your deposit.
Delivered to Auckland, Tauranga and Lyttelton. Two-storey homes ship in two containers.
Ocean freight from the factory to your nominated port, fully insured for the voyage. Port handling, customs clearance and transport from the port to your land are arranged locally and we help you plan them.
Galvanised steel frame, marine-grade finishes and double-glazed aluminium windows as standard. The Cyclone Ready package is available for high-wind zones.
Six single-storey homes, every one fully fitted with kitchen, bathroom, electrical, plumbing, windows and doors. Two-storey homes and custom layouts are priced in the configurator.
| Home | Floor area | House | Freight | Delivered to port | Cyclone Ready |
|---|---|---|---|---|---|
| 2 Bedroom · 20FT | 37 m² | A$31,000 | A$12,000 | A$43,000 | + A$6,500 |
| 2 Bedroom · 30FT | 54 m² | A$36,000 | A$12,000 | A$48,000 | + A$8,500 |
| 3 Bedroom · 30FT | 54 m² | A$38,000 | A$12,000 | A$50,000 | + A$8,500 |
| 2 Bedroom · 40FT | 74 m² | A$40,000 | A$12,000 | A$52,000 | + A$11,000 |
| 3 Bedroom · 40FT | 74 m² | A$42,500 | A$12,000 | A$54,500 | + A$11,000 |
| 4 Bedroom · 40FT | 74 m² | A$46,000 | A$12,000 | A$58,000 | + A$11,000 |
All prices AUD. Extra bedroom +A$455. Covered terrace +A$6,500. Solar package A$5,000 to A$9,000 by size. A water heater valued at A$1,500 is included free. Payment in three stages: 50% on order, 30% on factory inspection, 20% on arrival at port. 2-year warranty.
New Zealand sites need a building consent from your council and a foundation to the engineer's design. We supply the drawings and certification your council and builder ask for, and the Cyclone Ready package is available for high-wind zones.
Single-storey homes go up in under an hour with four workers and hand tools. Connect power and water, then move in.
Plan for 8 to 11 weeks from your order to the home on your land.
A 30 minute call, in your time zone, to go through your land, your family and the homes that fit. A written proposal follows within 48 hours if MAKO is the right fit.